BK1 News Logo

BK1 News You Need

Transparency Is Primary

Menu
  • Home
  • News
  • Español
  • Local Help
  • My Hope
  • Get Emails
  • About This Site
Menu

Category: English

Elevator #3 on Saturday 5/2/26 at 8:26PM

Only One Elevator. On a Saturday Night

Posted on May 4, 2026May 4, 2026 by Ken
Read more
Board President Does Not Return Email

Board President Does Not Reply to Email

Posted on April 30, 2026April 30, 2026 by Ken

Key Takeaways • No Response from Leadership An owner sent a detailed, urgent email on April 21 and received no response from the Board President—only a delayed reply from management a full week later. • Broken Timeline, Broken Trust Residents were told both elevators would be repaired by April 25. That deadline has passed, and…

Read more

“A picture is worth a thousand words” / “Una imagen vale más que mil palabras”

Posted on April 28, 2026April 28, 2026 by Ken

We deserve so much better Nosotros merecemos mucho mejor

Read more
Condo Board President (CPB) and Vertical Villain stop BK1 Elevator repairs

UPDATE: Fight then Fix vs Fix then Fight

Posted on April 21, 2026April 27, 2026 by Ken

🇺🇸 English | 🇪🇸 Español KEY TAKEAWAYS The Reality Residents Are Living Six Months. Two Elevators Down. Zero Resolution. This is no longer a delay — it’s a complete failure to act. Residents have been left dealing with unacceptable conditions for half a year. The Price Dropped. The Problem Didn’t. Costs were reduced dramatically, eliminating…

Read more
Boom Goes The Mandarin

Mandarin Implosion – My Flashbacks

Posted on April 15, 2026April 27, 2026 by Ken

🇺🇸 English | 🇪🇸 Español Maybe it’s because I have lived on BK1 for 30 years. Maybe it is I am just getting older… The Mandarin hotel implosion left me sad. I look at the rubble pile and feel like it is the grave of a departed friend. About 26 years ago I watched several…

Read more
Last Minute Decision

BK1 Condo Board Meeting – April 8, 2026

Posted on April 11, 2026April 27, 2026 by Ken

🇺🇸 English | 🇪🇸 Español Seismic Monitoring Decision Raises Questions on Timing, Transparency, and Alternatives The April 8, 2026 Board Meeting was primarily called to approve a vendor for seismic monitoring services ahead of the nearby Mandarin construction project, which is expected to continue through 2030. What should have been a straightforward decision instead raised…

Read more
  • Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • …
  • 10
  • Next
©2026 BK1 News You Need | Theme by SuperbThemes